SCHEDULE 21-3: EASEMENTS WITHIN MUNICIPALITIES
(Section 21.5.4)
| Municipality / Location | Purpose / User |
|---|---|
| 1. Iqaluit: on beachfront on Inuit Owned Lands Parcel 800 - SK - 197 width: 10 metres | repair, maintain, replace buried sewage line / Town of Iqaluit |
| 2. Iqaluit: on beachfront on Inuit Owned Lands Parcel 800 - SK - 197 width: 6 metres | repair, maintain, replace 2 surface drainage ditches / Town of Iqaluit |
| 3. Iqaluit: Inuit Owned Lands Parcel 800 - SK - 201 width: 6 metres | repair, maintain, replace above-ground water distribution line / Town of Iqaluit |
| 4. Iqaluit: Inuit Owned Lands Parcel 800 - SK - 201 width: 10 metres | repair, maintain, replace drainage ditch / Town of Iqaluit |
| 5. Iqaluit: Inuit Owned Lands Parcel 800 - SK - 201 width: 10 metres | repair, maintain, replace electric transmission line / N.W.T. Power Corporation |
| 6. Lake Harbour: Inuit Owned Lands Parcel 801 - SK - 028 width: 10 metres | repair, maintain, replace fuel distribution (P.O.L.) line / Government or owner of the line |
| 7. Pangnirtung: Inuit Owned Lands Parcel 804 - SK - 101 | emergency access to alternate community water supply / Municipal Corporation of Pangnirtung |
| 8. Cambridge Bay: Inuit Owned Lands Parcel 500 - SK - 112/113 | repair, maintain and upgrade and use of existing road from Cambridge Bay to Greiner Lake and Mt. Pelly areas / Public use |